Schedule-driven design control

Know whether the design pipeline is ready for the mine plan.

mineplan.IQ converts scheduled underground activities into a controlled pipeline of design deliverables, milestones and gates—then keeps that pipeline aligned as the schedule changes.

Self-hostedMicrosoft 365 SSOData stays in your environment
IQDesign pipeline
Schedule current
ACTIVE HORIZONNext 90 days
ACTIVITYLEVELSTARTREADYGATE
3150–102 StopeProduction design3150 RL18 JUL4 / 6HARD
3125 East AccessDevelopment design3125 RL22 JUL2 / 5HARD
3100–08 Drill DriveDrill and blast3100 RL02 AUG4 / 5SOFT
3075 West VentInfrastructure3075 RL11 AUG5 / 5NONE
READINESS EXCEPTION3125 East Access has 2 incomplete hard-gate steps
T–11D

Illustrative product view · demonstration data

INPUTMine scheduleDeswik + structured CSV
CONTROLDesign pipelineMilestones + steps + fields
OUTPUTOperational readinessRisk + movement + accountability

01 / THE CONTROL GAP

The schedule changes. The design pipeline has to move with it.

A planning update can change dates, quantities and priorities in one pass. The design work behind that schedule is usually distributed across spreadsheets, inboxes and individual judgement. mineplan.IQ gives that work a controlled system of record.

01

SCHEDULE

Read demand

Import scheduled activities, dates, quantities, levels and zones.

SOURCE
02

RECONCILIATION

Control change

Detect additions, removals and movement without discarding manual inputs.

COMPARE
03

DESIGN CONTROL

Expose readiness

Track required deliverables and gates against scheduled start dates.

ACT

02 / CAPABILITY

One control layer between schedule demand and design delivery.

Built around the way underground technical-services teams already plan, review and hand work across disciplines.

01

Schedule ingestion

Bring structured exports from Deswik and other scheduling sources into one controlled workflow.

CSV · FIELD MAPPING · VALIDATION
02

Change reconciliation

See what moved, appeared or disappeared while controlled manual inputs persist through every re-import.

ADDED · MOVED · REMOVED
03

Milestones and gates

Define the work each scheduled activity requires, from milestone to step to field-level completion.

HARD · SOFT · TRACKED
04

Pipeline visibility

Inspect design demand through dense task tables, timelines, Gantt views and field workflows.

TASKS · TIMELINE · GANTT
05

Risk and movement

Find upcoming work exposed by incomplete design, changing dates or blocked dependencies.

AT RISK · MOVEMENT · HEALTH
06

Operational governance

Control roles, activity mappings, work types, notifications and site configuration.

ROLES · RULES · CONFIG

03 / OPERATING MODEL

From schedule file to an accountable workfront.

Each update follows the same traceable path, so teams can spend less time rebuilding trackers and more time resolving the work that matters.

  1. 01

    Import

    Read the latest schedule demand.

  2. 02

    Map

    Connect activities to required work.

  3. 03

    Reconcile

    Review movement and exceptions.

  4. 04

    Generate

    Create the design pipeline.

  5. 05

    Progress

    Complete milestones and gates.

  6. 06

    Review

    Act on risk and readiness.

04 / DECISION VIEWS

See the plan through the work required to deliver it.

Hard gateSoft gateTracked
DASHBOARD / PIPELINE HEALTHDesign stock health
READINESS BY HORIZONWORK ITEMS
0–30D31%
31–60D64%
61–90D82%

Near-term exposure is concentrated in two hard-gated activities.

AT-RISK WORKNEXT 30 DAYS
013125 East Access2 hard gates incompleteT–11D
023150–102 StopeGeotech sign-off outstandingT–16D
033100–08 Drill DriveSoft gate requires reviewT–22D

Illustrative product view · demonstration data

05 / GATE LOGIC

Govern the workflow without hiding engineering judgement.

Apply the level of control each requirement needs. Teams can prevent premature progression, surface a warning, or track an item without restricting the workflow.

HHARD GATE

Block progression

The activity cannot advance until the requirement is complete.

REQUIRED
SSOFT GATE

Warn the team

The workflow can progress, but the outstanding requirement stays visible.

REVIEW
NNO GATE

Track only

Record progress without changing the activity’s permitted state.

INFORM

06 / TECHNICAL ARCHITECTURE

A practical stack for controlled mine infrastructure.

Conventional, supportable components with clear data boundaries—designed to run inside the client environment.

01

Schedule sources

Deswik / structured CSV

02

Control layer

Import + reconciliation API

03

Data layer

PostgreSQL + site isolation

04

Application

FastAPI + Next.js

05

Engineering views

Tasks / timelines / dashboards

NEXT.JS + TYPESCRIPTFASTAPI + PYTHONPOSTGRESQL 16MICROSOFT ENTRA IDDOCKER DEPLOYMENTREST + SERVER-SENT EVENTS

07 / DEPLOYMENT CONTROL

Planning data stays where your planning team controls it.

mineplan.IQ is designed for self-hosted deployment inside the client’s infrastructure. Authentication, site access and data boundaries stay explicit.

Self-hosted deploymentRun the application and database within your controlled environment.

Microsoft Entra IDUse existing Microsoft 365 identity and sign-in controls.

Role-based accessSeparate administration, scheduling, editing and viewing permissions.

Site-level isolationPostgreSQL row-level security applies site context at the data layer.

LIVE PRODUCT DEMONSTRATION

Inspect the workflow in the demo.

Follow schedule demand through reconciliation, task generation, milestone control and pipeline reporting using demonstration data.